Connex Box Insulation

Service Division: Marine Insulation
Team Involved: Norfolk

Our team custom-fabricated and installed 2” cloth-faced fiberglass hullboard for a newly constructed connex box. The insulation was measured and cut on site to meet the exact specifications, providing both thermal and acoustic benefits. We coordinated closely with the client’s schedule to ensure a smooth and efficient installation process.

This project required close coordination with other trades; our insulation work needed to be completed before equipment installation could begin. By fabricating the material on site, we were able to achieve a custom fit and maintain quality control throughout the process.

The project was completed on time and met all specifications. The installed insulation improved both temperature control and sound reduction within the connex box for long-term performance.

Project Details

  • Location: Norfolk, VA
  • Completion Date: September 2023
  • Project Duration: 30 Days

This is the start of the project. The first step is installing insulation hangers with adhesive so the hullboard can be properly held in place. This is done in accordance with specifications.

Near the end of the project. Insulation is almost 100% installed. Fiberglass tape and vapor barrier have been installed at all the seams. On the right-hand side, insulation has been measured/cut and is ready for installation.

Work completed, all insulation has been installed and painted. Equipment is now being installed.